We aim to complete the construction of a single-story building at CARUMCO, featuring 4 lecture halls, 4 offices, and restrooms. The need for this facility is real and urgent, as over the last two years, the student body has tripled from 150 to over 450, forcing some to take classes from the tree's shade.
You Could Help
$92,000 has already been spent on the project, and we need an additional $83,000 to complete it.
Thank you message from Fr. Respicius Camara,
Principal of CARUMCO on your ongoing support.

Site Clearing and Leveling, Foundation works, Structural framework, Wall Construction, Floor Base Preparation, Water Supply System Installation. TOTAL COST: $92,000

Roofing Stage, Floor Finishing Stage, Fitting Stage (doors, windows, plumbing, toilets, internal fixtures), Finishing Stage (plastering, painting, surface treatment), Electrical Installation, Septic system Installation. TOTAL COST: $83,000
The new building is designed to foster an effective learning environment, which is expected to enhance the overall educational experience. Additionally, it will contribute to the beautification of the campus while also helping to increase student enrollment.
An Appeal from CARUMCO’s Principal.
Brighter Future for Kagera (BFK) Foundation
14301 N. 87th Street, Suite 208, Scottsdale, AZ 85260 BrighterFutureforKagera@gmail.com
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.